Work restarts on Folkestone East


After mothballing the layout for 18 months whilst I worked on other projects, I have finally flung the dust covers off the layout and started to deal with some problems with it (I admit to making a pig’s ear of some aspects of the layout, ears which now need to be rectified). Operating wrinkles also needed to be ironed out too.

The first job involves the original laser cut turnouts which made up the curved cross-over at the Ashford end of the layout. This junction, which provides access to the harbour branch turn-back roads and yard, is the most critical on the layout. Using laser-cut turnout bases and glued chairs is a good technique and looks great too except for one thing: they are not durable enough for a heavy duty main line hosting a frequent train frequency. As a facing pair of turnouts on the main line, they were becoming badly damaged by the heaviest locos in the fleet, namely my Heljan Class 47s. At nearly 750g each, they were knocking six shades of hell out of that cross-over to the point they no longer worked properly and repairs were impracticable. New ones of more durable soldered construction (see above) were built at the work bench and installed in January.

A plan to remodel the unsuccessful western end of the layout was in mind anyway, so turnout replacement fitted well with the building of some flats based loosely on Lawrence Court just off the Dover Road together with remodelling the scenery and modifying the back drop to make room for the partial low relief buildings.

During the 18 month period of storage, further information regarding a row of brown-brick buildings (predominantly hidden behind weed trees on the line side) became available, buildings which turned out to be the Lawrence Court flats. Winter-time images with trees bare of leaves revealed how dominant these low-rise flats actually are at this location. Whilst the real main line on which this layout is inspired is dead straight in this location, I have to live with a curve as it is located at the end of the room! There’s no extending the layout through the wall and into my neighbour’s field without objections from the sheep and other practical difficulties! The flats were nearly complete by the time I found the time to write this blog entry. They fit on the curve of the layout quite well, being partial low-relief buildings. Ideally, they should be set a little further back from the line, but the curve in the track makes placing the buildings tricky. Once the landscaping around and to the rear of the flats is complete, trees will be added to the line side once again partially concealing them.

The Up platform will be reinstated and track work reballasted and fitted with conductor rails once again. As part of this project, the signal box project has made a giant leap forward. Some adjustment to the back drop by moving it back by 3 inches and changing its shape a little has provided more room for the signal box (as well as the flats) which is moved east a little further to better position it in relation to the prototype location. Oh, yes, I must mot mention the retiring of the faithful Heljan 47s in favour of Bachmann ones (less damaging to the track) and the introduction of Dapol Class 73s (one picture above) which are gradually replacing my venerable Lima ones. More of the signal box, remodelling and the commissioning of the Class 73s later!